Cookies
We use cookies to run the site and (only with your consent) for analytics and marketing.

Geothermal drilling project software

Coordinate geothermal borehole projects with a complete operational record

Geothermal jobs involve property owners, designers, drillers and documentation that must remain connected to the right location. BoreSys gives the team one controlled project workspace.

For contractors and engineering teams delivering vertical ground-source and other geothermal borehole projects.

Project-level document control

Track the required files and current status for each site.

Participant coordination

Keep internal staff and invited specialists aligned around the same project.

Location history

Retain borehole and delivery context against the mapped site.

Operational workflow

Coordinate the project without losing specialist context

BoreSys organises the operational workflow around the engineering work rather than trying to replace it.

  1. 01

    Open the site record

    Add the customer, address, project type and responsible people.

  2. 02

    Define requirements

    List the project documents, tasks and expected dates.

  3. 03

    Follow delivery

    Update status, upload files and record decisions.

  4. 04

    Retain the handover

    Keep the final set and project history accessible.

BoreSys geothermal drilling project document checklist
Project documentation controlInterface shown with sample data

Product scope

A shared control layer for a multi-party project

The value is not another engineering file format. It is the operational link between the site, people, documents and actions that determine whether the project is ready to move forward.

  • Document checklist per geothermal project
  • Mapped site and borehole context
  • Roles for company staff and invited participants
  • Status, dates, invoices and retained project history

Common questions

Is BoreSys geothermal design software?

No. It controls project operations and documentation around the specialist design process.

Can designers and contractors share the project?

Yes. Invite participants and assign the access and responsibility appropriate to their role.

Can every site have different document requirements?

Yes. The project record can reflect the documents and tasks required for that particular job.

Bring one geothermal project into a controlled workspace

Start the 90-day trial and validate the process with an active job.

Create your account